The major items of WORK include: The PROJECT will replace existing cast iron watermains. The approximate quantities and major components include: approximately 27,500 lf of 2, 4, 6 and 8-inch C900 PVC waterlines utilizing a combination of HDD and open trench methods; 365 lf of 10 and 12-inch cased bore; 9,230 lf of 1” and 2” HDPE service lines; 223 service connections, new meter pits, 220 new AMR meters (5/8” & 2”) to interface with the existing radio read and billing system; 82 gate valves; 41 fire hydrants, 1 bulk water station; all fittings, connections, abandonments, surface restorations, seeding, erosion and traffic control, coordination with local utility companies and all other items for a complete and operating as intended system.