The major items of WORK include: The PROJECT will replace existing cast iron watermains. The approximate quantities and major components include: approximately 27,500 lf of 2, 4, 6 and 8-inch C900 PVC waterlines utilizing a combination of HDD and open trench methods; 365 lf of 10 and 12-inch cased bore; 9,230 lf of 1” and 2” HDPE service lines; 223 service connections, new meter pits, 220 new AMR meters (5/8” & 2”) to interface with the existing radio read and billing system; 82 gate valves; 41 fire hydrants, 1 bulk water station; all fittings, connections, abandonments, surface restorations, seeding, erosion and traffic control, coordination with local utility companies and all other items for a complete and operating as intended system.
The Munchkinland Playground project involves the redevelopment of an existing community playground into a safe, inclusive, and engaging play space for children of all ages and abilities. The scope of work includes the demolition of an outdated wood playground structure, preparation of the site, and installation of new play equipment, safety surfacing, fencing, sidewalks, and drainage improvements. Designed with accessibility and long-term durability in mind, the new layout emphasizes ADA compliance, low-maintenance materials, and age-appropriate play zones. The project will incorporate sustainable design elements and meet current safety standards, providing a vital recreational asset for the community.
The current Bremen Farmers Mutual Insurance Company (BFMIC) office is comprised of four buildings that have been constructed with a variety of construction techniques and materials. Each building served to match the rapid growth of the company but failed to maintain ADA connections and logistical space planning. In addition to consolidating spaces to better match the current and future needs of the company, there will be approximately 6,000 sq. ft. of finish upgrades to existing office spaces through typical tenant improvements and 3,000 sq. ft. of structural modifications and floor plan reconfigurations.
The project will generally consist of road reconstruction and storm sewer rehabilitation and re-placement. The following approximate major quantities of work include 5,100 SY of 7 Inch Concrete Pavement with AB-3 base, 2,700 LF of Curb & Gutter, 760 SY of Sidewalk and Ramps, 13 storm sewer inlets and manholes, 500 LF of Storm Sewer, 4 Sanitary Manhole Re-placements, and all other incidental and appurtenant work as shown and specified.